ECG Load-shedding Timetable For June Released (Check It)

Check the ECG Load-shedding Timetable(June)

ECG Load-shedding Timetable

The Electricity Company of Ghana (ECG) has released its timetable for the emergency load shedding for the month of June. It starts from Sunday June 1, 2014 to Saturday June 28, 2014. Click on the link below to view or download the pdf format of the time table.

ECG Load Shedding Time Table- June.

According to recent reports, the ongoing power crisis is set to worsen as the Bui Power Authority (BPA) has announced a reduction in its current generation capacity.

Officials of the Authority say the dwindling level of water in the dam has compelled authorities to limit the generation capacity.

Tags:

3 Comments

  1. amponsem kwami says:

    Ecg go kill us again we tire for dis load shedding koraaaa we are living i our own country lik refegeessss

  2. nkwaseafo says:

    Ecg fo nkwaseafo nkoaa

  3. Kwasia s3m we livin in a country which some people ar not serious

Leave a Reply

Your email address will not be published. Required fields are marked *